PROJECT ID

PJ19-W2 CI

PROJECT TYPE

Industrial research

FLAGSHIP

Transversal

STATUS

Completed

SESAR PROGRAMME

SESAR 2020

PROJECT DURATION

2019-12-01 > 2023-06-30

TOTAL COST

€ 25 731 396,36

EU CONTR.

€ 4 473 968,99

GRANT ID

874473

PARTICIPANTS

Eurocontrol, Airbus, Deutsches Zentrum für Luft- und Raumfahrt, Oro Navigacija, Polska Agencja Zeglugi Powietrznej, Luftfartsverket, Direction Des Services De La Navigation Aerienne (DSNA), Enaire, Enav, Frequentis, Indra Sistemas Sa, Leonardo, Sintef, NATS, Skyguide, Thales Las France , Stichting Koninklijk Nederlands Lucht - En Ruimtevaartcentrum, Rizeni Letoveho Provozu Ceske Republiky Statni Podnik, Letove prevadzkove, Austro Control , Hrvatska Kontrola Zracne Plovidbe, Udaras Eitliochta Na Heireann - The Irish Aviation Authority (IAA), Naviair, Eviden, HungaroControl, Airtel Atn , Saab Aktiebolag

PJ19 W2 CI is a transversal activity of the SESAR 2020 Programme in continuation of the SESAR Wave 1 PJ19 CI Content Integration project.

It aimed to integrate the SESAR Solutions into the integrated European ATM System in order to achieve the objectives set by the ATM Master Plan (MP). This integrated European ATM System provides the overall European ATM concept, the high level architecture options, the services, the supporting solutions, and the performance achievements associated with them. As such, PJ19 W2 did not create any specific ATM concept or solution but produced a set of deliverables which consolidate the SESAR 2020 Programme outcomes and provides yearly integrated reference material – the SESAR 2020 Architecture release (EATMA version) . This was done in close collaboration and coordination with all SESAR 2020 Solutions and the SJU through continuous, rolling and iterative content integration.

PJ19-W2 allowed the assessment of the overall performance of the SESAR Solutions compared with the performance improvements expected for the European ATM. Whilst the decisions are made by SJU management and SESAR governance, PJ19 W2 activities supported and guided the processes (e.g. safety, security assessment, human performance, performance assessment, cost benefit analysis (CBA), architecture, requirements) to bring the SESAR Solutions together and assess their maturity (completeness, consistency and coherency) from a holistic perspective represented in the SESAR 2020 Concept of Operations.

The PJ19 W2 activities provided major inputs for the ATM MP production (ATM architecture information (e.g. data set), performance and CBA consolidation, business case production), which were further consolidated at the time of the ATM MP update campaign by the PJ20 W2 ‘Master Planning’ project. PJ19-W2 provided support for the SJU/SESAR governance decision-making and programme execution monitoring and also contributed to the realisation of the ATM MP.

European Union
Content Integration, Performance Management and Business Case Development (Wave 2) content integration eATM portal eATM