The SWIM Work Package is the follow-up of the SWIM SUIT FP6 Commission project in the context of SESAR. It will use as an input the SWIM-SUIT deliverables and adapt them or further develop them to cope with the SESAR Work Programme components.

WP 14 will contribute to the ATM Master Plan Achievement by:

  • Following-up the SWIM-SUIT project activities and deliverables in order to identify the applicability of the results to the SESAR Work Programme and in particular the ability to support the ‘Intranet for ATM’ concept of operations by:
    • Demonstrating an Inter-system seamless exchange of data in the SESAR ATM environment using SWIM test platform to validate concepts.
    • Providing SWIM test platforms.

The Objectives of WP 14 are to:

  • Define and validate the infrastructure solution for SWIM addressing the requirement received from Information Management (WP8). The SWIM WP will have to interface with all other System WPs (9-15);
  • Further develop the ‘Intranet for ATM concept’ by:
    • Performing an assessment of the Information Management needs of the SESAR CONOPS, as scoped by WP 8, to define the SWIM technical services that will be required,
    • Using the SWIM-SUIT results, to translate the results of the assessment into an architectural description, technological options and system solutions;
  • Develop SWIM test platforms to support the operational and technical aspects of the SWIM validation and to provide regularly demonstrations;
  • Provide adequate support for SWIM exploitation to the other System WPs in order to ensure that system WPs will develop appropriate interface with SWIM (via its IOP-middleware) and avoid system WPs assessing their impact on SWIM.

Contributors to this work package are:

WP 14 is further organised into 9 projects:

SWP 14.0 Global Co-ordination and Management

SWP 14.1 Alignment with SWIM-SUIT FP6 and SWIM Infrastructure Specifications
14.1.1 SWIM SUIT FP6 follow-up and alignment
14.1.2 Identification of Technology and services options
14.1.3 SWIM Design
14.1.4 Interface specifications and Services Technical requirements

SWP 14.2 SWIM Test Platforms
P 14.2.1 SWIM Middleware
P 14.2.2 SWIM Security solutions
P 14.2.3 SWIM technical supervision
P 14.2.9 SWIM Platform development and Demonstrator delivery

SWP 14.4 SWIM Exploitation

Information to follow after the initiation phase.